752 Warrigal Road |
Soil being piled onto the former ACU site |
Drilling for wall posts |
Closeup of drilling |
|
752 Warrigal, Intersection |
Soil being piled |
Wall posts can be seen on the right |
Wall posts between warrigal/webster |
Wall posts between webster/capon |
Half of wall between capon/webster have been installed |
|
Middle Road, looking towards the Centre Tags: middle road |
Wall Progress |
|
|
Construction Signs |
Unfinished wall (Webster-Capon) |
|
Construction/Demolition Permit Notice |
View from Capon St |
Spray marking for capon St roadblock |
View of webster/middle road intersection |
|
Wall post drilling at Warrigal Rd |
|
Middle Road as at 20 March |
Closeup of drilling at Warrigal Rd |
|
|
Barriers along Middle Rd |
Middle Road, blocked to cars & pedestrians |
View of the webster street intersection |
Capon St also blocked off Tags: capon street |
Footpath Blocked off on the 29th |
|
Starting the excavations |
Footpath Blockage |
A view near Capon St |