|
|
Middle Rd excavations at 05 August |
|
|
|
|
|
New intersection at Capon St |
|
|
Overview of carpark construction |
The roundabout |
|
|
|
|
Closeup of carpark constructions |
The old carpark boundary rd |
Repositioned roundabout near Dandenong Rd |
|
The Middle/Capon intersection, viewed from multi-level carpark |
The new road, prior to opening |
|
|
New ramp to underground carpark |
New carpark (southern side) |
Closeup of new underground carpark ramp |
The kerb is removed at warrigal rd |
|
Work on the new retaining brick wall along the walkway |
Corner of middle rd/warrigal rd |
New roadway flattened, ready for bitumen |
The mess while the brick wall is constructed |
Errecting the barrier wall along the walkway Tags: footpath |
The crane listing the barrier walls |
Most of the walkway barriers are in place |
Overview of chadstone place carpark |
New decorative trees in new carpark |
Retaining walls installed around the new underground carpark |
Supporting poles and excavators |
|
Traffic flowing at new intersection |
A view from middle road near webster st |
More bitumen laid on the new underpass |
|
Temporary slip lane to new perimiter road (not yet open) |
Closer view of underpass |
The underpass, closer view |
Bitumen being laid at the underpass |
|
|
|
First look at the slip lane to the new perimiter road |
Just entering the perimiter road |
|
|
|
The capon st perimiter road |
Signage for new chadstone carpark access |
|
Palm trees near the roundabout |
|
|
On the way out (warrigal rd exit sign) |
|
Intersection at the exit of the perimiter road |
|
Preparing the shortening of the median strip on warrigal rd Tags: warrigal road |
Signage indicating new chadstone parkinh |
Laying the foundations of the new multi-level carpark |
Closeup of foundation laying |
Changed Traffic Condition at roundabout |
Capon St Intersection as at 17 August |
Entrance to perimiter rd |
Side view of multi level carpark retaining wall |
|
Barriers seen from scotchman's creek bridge |
Middle Rd/Warrigal Rd intersection seen from scotchman's creek park |
Digging up the median strip on Saturday 18th Aug |
Closeup of digging medial strip |
View of middle rd from pedestrian crossing |
|
Closeup of median strip, right lane |
Sunday, all dug up, ready for bitumen |
New bitumen almost fully laid along middle rd underpass |
Middle Rd Entry/Exit point for Capon/Webster St |
Metal stakes, ready for laying of privacy wall |
Slip lane into the perimiter road |
'Best Parking' sign |
Capon St / Middle rd intersection |
New bitumen laid on corner of Warrigal Rd/Middle Rd (underpass) |
Warrigal Rd median strip before being filled with bitumen |
A View of the new middle road from warrigal rd |
Pedestrian walkway yet to be finished |
Pile of bitumen on unsealed part of new middle rd |
|
The roundabout, before being dug up |
First half of concrete base laid in new multilevel carpark |
Middle Rd, in the Shopping Centre |
New plants along the new Webster St Ramp to Middle Rd |
landscapers along Middle Rd |
A gardener working on the new foliage |
Cranes lifting new retaining walls for multilevel carpark |
Digging up the roundabout |
Lolipop man directing traffic around the fated roundabout |
Closeup of 'Piling' Machine Tags: cdl |
A worker puts up 'Probuild' meshing to shroud the construction works |
Landscapers near the Capon St intersection |
One last view of the roundabout |
Workers install the new curb |
At the Middle Rd footpath |
New intersection as seen from pedestrian crossing |
Cranes and machinery sitting on the new underpass |
The unfinished footpath along Middle Rd south |
Traffic diversions at the chadstone entrance |
A new section of wet concrete at the new carpark |
Pile of old bitumen next to new carpark |
The old road to the roundabout is fenced off |
The narrow, old road left for access to the coles carpark and bus stops |
Portable offices make up another temporary site office at the Chadstone Place carpark |
Chadstone Place carpark & roudabout |
Garbage skip on the old ramp to the underground carpark |
The old underground carpark ramp |
Portable Offices |
The view of the excavations from the Chad Place carpark |
Excavations for new underground carpark ramp |
Webster St bridge, eastern side |
Webster St Bridge, looking straight down |
Webster St bridge, western side |
Webster St bridge, seen from Warrigal Road |
The Webster St bridge (as seen from the west) |
Capon & Webster St ramp exit |
a Site Safe and bricks on the Capon St ramp |
Capon St privacy wall under construction |
Middle Rd/Perimiter rd intersection |
Webster St Bridge |
Top surface of Webster St bridge |
|
New Middle Rd, western side of bridge |
|
Side walls of carpark are in place |
construction works around the former roundabout |
Cranes at old roundabout |
Fenced off area near the roundabout |
Intersection, with half finished capon st wall |
The new gap for Capon St North to enter/exit |
Capon St North wall |
Middle Rd intersection at 30 Sept |
Eastern side of new carpark floor fully laid |
Western side of new carpark unfinished |
Warrigal Road, with barries on the old part of middle rd |
Trucks exiting the new part of middle road |
Builders oversee the new middle road from the pedestrian walk |
Travelling under the middle road bridge |
Temporary signage for directions to carparks |
|
Changed Traffic Conditions sign at warrigal road |