![]() Unfinished pedestrian crossing at Warrigal Road |
![]() The four-lane middle road |
![]() Earthworks on the park side |
![]() Half of the old Middle rd bitumen has been dug up |
![]() |
![]() |
![]() |
![]() |
![]() Barriers as seen from the northern Middle Rd footpath |
![]() Old Middle Rd traffic light not in use |
![]() Digging up bitumen into haulage truck |
![]() New sign advising drivers of no Warrigal Road Access |
![]() The CDL shipping container moved uphill of old Middle Rd |
![]() Concrete drying at the new multilevel carpark |
![]() |
![]() CDL shipping container |
![]() Building works at the BiLo escalators |
![]() part of middle rd about to be ripped up |
![]() Middle Road residents are fenced off |
![]() |
![]() Middle Road bridge |
![]() |
![]() A diesel powered floodlight sits near the rubble |
![]() Roadblock at webster st (south) |
![]() At the top of the Webster St access ramp to Middle Rd |
![]() Pile of soil just before the Webster St bridge |
![]() Foliage along the concrete wall (Webster St) |
![]() |
![]() |
![]() Advisory signs at Capon St |
![]() The privacy wall at the end of Capon St (South) |
![]() The curve before the ramp down to Middle Rd (At Capon St) |
![]() A 'Site Safe' sits behind the fence |
![]() |
![]() Travelling eastwards on the new Middle Rd / Underpass |
![]() Close to the Webster St bridge |
![]() |
![]() Webster St Bridge support beam |
![]() Approach to Warrigal Road traffic lights |
![]() The inbound lane and sidewalk |
![]() Barriers and temporaty lighting at the old Middle Rd |
![]() Speed humps installed on perimiter (ring) rd |
![]() Digging for new right-hand turn lanes |
![]() |
![]() New 'no access to Warrigal Rd' signage for Webster St |
![]() Piling machines cut bitumen |
![]() Capon St (North) privacy wall |
![]() |
![]() A new slab of concrete being poured at new carpark |
![]() |
![]() |
![]() Western end of Middle road to be excavated |
![]() Capon St (North) privacy wall |
![]() Possibly an exit lane for the new carpark? |
![]() 'Bus Only' road markings |
![]() Old gas/water/sewerage cage still standing |
![]() Cutaway showing edge of undergound chadstone place carpark |
![]() Fenced off area as seen from Webster St |
![]() Stormwater drain pipes sitting on old Middle Road |
![]() Middle Road/Warrigal Road intersection |
![]() Barriers extend the median strip on Warrigal Road |
![]() Bitumen and rubble at the lower end of Middle Road |
![]() Excavated area at middle road for 2 right-hand turning lanes |
![]() The intersection at night. New street lighting |
![]() Diesel powered temporary lighting rig |
![]() Workers finalise the new left-hand lanes |
![]() Looking down middle road, with the new turning lanes |
![]() Cement mixer at the webster st bridge |
![]() |
![]() |
![]() |
![]() Piling machine drills up dirt |
![]() Turning Lanes |
![]() New steel reinforcing wire mesh poles |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() Trucks & drilling near Webster St |
![]() Cement Mixer and Trucks on Webster St |
![]() |
![]() Warrigal Rd/Middle Rd intersection |
![]() Rubble and earth at the bottom of Old Middle Rd |
![]() The new footpath has not changed since July Tags: footpath |
![]() Cars turning right into middle rd |
![]() Multi-level carpark progress |
![]() |
![]() |
![]() Bus-only road along the multi-level carpark |
![]() A crane lifts concrete on warrigal rd |
![]() Workers working on the footpath. Steel mesh laid |
![]() |
![]() Piling machine lifts a wire mesh cylinder |
![]() |
![]() Pedestrian Signage on old Middle Rd |
![]() Piling machine with drill bit |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() CDL piling machine on Middle Rd Tags: cdl, middle road |
![]() |
![]() |
![]() |
![]() |
![]() Melways comparison of Middle Road (Before & after) |
![]() |
![]() Middle Rd new footpath 25 Sept |
![]() Middle Rd/Warrigal Rd Intersection |
![]() |
![]() |
![]() Excavation progress on old Middle Rd |
![]() Lower part of excavations near Warrigal Rd |
![]() Remaining part of Old Middle Rd for residents |
![]() Excavations near the Webster St Bridge |
![]() The temporary excavations ramp at Warrigal Rd traffic lights Tags: excavation |
![]() A generator/compressor sits near the Webster St bridge |
![]() Ramps to Webster & Capon St |
![]() Excavator at western end of Middle Rd |
![]() |
![]() CDL Piling machines |
![]() |
![]() |
![]() New multilevel carpark - preparing for puring of concrete on 1st level |
![]() |
![]() |
![]() |
![]() Traffic controller at intersection, allowing only buses to enter |
![]() Looking down old Middle Rd |
![]() Signage at Warrigal Rd for pedestrians Tags: vandalism, footpath |
![]() More pedestrian signage at Warrigal Rd |
![]() Construction Site sign |
![]() excavations have almost flattened the second part of middle road Tags: excavation |